STREET SHARK PROGRESS REPORT

 

THE SHARK IS BACK FROM THE HOT ROD MAGAZINE POWER TOUR. THE POWERS TO BE AT CRANE CAMS HAVE EMPOWERED VHP TO PROCEED WITH THE NEXT STEP,

INCIDENTALLY, IT'S INTERESTING THAT THE SHARK DYNO'ED WITHIN 1 HORSEPOWER OF VHP RESULTS ON ANY OF THE OTHER DYNOJETS ON THE TOUR!

WE HAVE COMPLETED THIS PACKAGE. HERE ARE PHOTOS TAKEN AT VHP.  IN ORDER TO GAIN PROPER ACCESS TO REPLACE THE OIL PUMP, IT IS ADVISABLE TO REMOVE THE ENGINE FROM THE VEHICLE. WE ALSO REPLACED THE CLUTCH ASSEMBLY,  SO WE ELECTED TO REMOVE THE FRONT K-MEMBER WITH ENGINE AND TRANSMISSION.

 

SHARK RECEIVES A SET OF SHAFT MOUNT ROCKERS

 

UPDATED 8/20/03
THE VHP PUNISHER POWER PACKAGE

 


FRONT CHASSIS OUT OF CAR


UNDER CAR LESS ENGINE

 


CLOSE UP OF SHORT BLOCK BEFORE CLEANUP

 


CLOSE UP OF SHORT BLOCK AFTER CLEANUP


SHORT BLOCK LESS TIMING CHAIN, CAM, AND OIL PUMP

 


INSTALL  CRANE ROLLER CAMSHAFT
 


INSTALL CRANE ROLLER LIFTERS
 


INSTALL DOUBLE ROLLER TIMING CHAIN SET

 


INSTALL BLUEPRINTED OIL PUMP
 


 INSTALL CYLINDER HEADS

 


INSTALL CRANE ROLLER ROCKERS

 


S.P.E.C. STAGE 2 CLUTCH SET
 


CLUTCH SET ON ENGINE

 


INSTALL LONG BLOCK IN CHASSIS

DYNO RESULTS OF PUNISHER POWER PACKAGE!

INSTALLATION PICTURES OF THE UNDERDRIVE PULLEY PACKAGE


STREET SHARK ON LIFT

 


COOLING FANS, BELTS, STOCK PULLEYS



UNDERDRIVE PULLEYS INSTALLED
 


STOCK PULLEYS COMPARED TO UNDERDRIVE

click here to return to home page